MICHIGAN CIVIL DEFENSE MUSEUM

Thunderbolt Final Assembly

Here are some images of the last stages of assembly

Rotator head attached to standpipe and lifted up.

Upontop2.jpg
Upontop2.jpg

Support Arm for the Horn is attached

supportattached.jpg

Horn is attached 
and the back cover of the rotator box is reinstalled 

Upontop2.jpg
Upontop2.jpg

Screen is reinstalled,
with new screen material installed onto the frame

Upontop2.jpg

Back to home Page